D7net
Home
Console
Upload
information
Create File
Create Folder
About
Tools
:
/
proc
/
thread-self
/
root
/
usr
/
lib
/
python3.6
/
site-packages
/
dateutil
/
Filename :
easter.py
back
Copy
# -*- coding: utf-8 -*- """ This module offers a generic easter computing method for any given year, using Western, Orthodox or Julian algorithms. """ import datetime __all__ = ["easter", "EASTER_JULIAN", "EASTER_ORTHODOX", "EASTER_WESTERN"] EASTER_JULIAN = 1 EASTER_ORTHODOX = 2 EASTER_WESTERN = 3 def easter(year, method=EASTER_WESTERN): """ This method was ported from the work done by GM Arts, on top of the algorithm by Claus Tondering, which was based in part on the algorithm of Ouding (1940), as quoted in "Explanatory Supplement to the Astronomical Almanac", P. Kenneth Seidelmann, editor. This algorithm implements three different easter calculation methods: 1 - Original calculation in Julian calendar, valid in dates after 326 AD 2 - Original method, with date converted to Gregorian calendar, valid in years 1583 to 4099 3 - Revised method, in Gregorian calendar, valid in years 1583 to 4099 as well These methods are represented by the constants: * ``EASTER_JULIAN = 1`` * ``EASTER_ORTHODOX = 2`` * ``EASTER_WESTERN = 3`` The default method is method 3. More about the algorithm may be found at: http://users.chariot.net.au/~gmarts/eastalg.htm and http://www.tondering.dk/claus/calendar.html """ if not (1 <= method <= 3): raise ValueError("invalid method") # g - Golden year - 1 # c - Century # h - (23 - Epact) mod 30 # i - Number of days from March 21 to Paschal Full Moon # j - Weekday for PFM (0=Sunday, etc) # p - Number of days from March 21 to Sunday on or before PFM # (-6 to 28 methods 1 & 3, to 56 for method 2) # e - Extra days to add for method 2 (converting Julian # date to Gregorian date) y = year g = y % 19 e = 0 if method < 3: # Old method i = (19*g + 15) % 30 j = (y + y//4 + i) % 7 if method == 2: # Extra dates to convert Julian to Gregorian date e = 10 if y > 1600: e = e + y//100 - 16 - (y//100 - 16)//4 else: # New method c = y//100 h = (c - c//4 - (8*c + 13)//25 + 19*g + 15) % 30 i = h - (h//28)*(1 - (h//28)*(29//(h + 1))*((21 - g)//11)) j = (y + y//4 + i + 2 - c + c//4) % 7 # p can be from -6 to 56 corresponding to dates 22 March to 23 May # (later dates apply to method 2, although 23 May never actually occurs) p = i - j + e d = 1 + (p + 27 + (p + 6)//40) % 31 m = 3 + (p + 26)//30 return datetime.date(int(y), int(m), int(d))
Name
Size
Last Modified
Owner
Permissions
Actions
__pycache__
Dir
July 28 2023 2:57:15
root
0755
tz
Dir
July 28 2023 2:57:15
root
0755
zoneinfo
Dir
July 28 2023 2:57:15
root
0755
__init__.py
0.067
KB
July 10 2017 6:32:22
root
0644
_common.py
0.75
KB
July 10 2017 6:32:22
root
0644
_version.py
0.214
KB
July 10 2017 6:32:22
root
0644
easter.py
2.567
KB
July 10 2017 6:32:22
root
0644
parser.py
49.745
KB
July 10 2017 6:32:22
root
0644
relativedelta.py
22.603
KB
July 10 2017 6:32:22
root
0644
rrule.py
60.386
KB
July 10 2017 6:32:22
root
0644
tzwin.py
0.058
KB
July 10 2017 6:32:22
root
0644
2017 © D7net | D704T team